ZX200-3 China high reduce speed reduction gearbox

ZX200-3 China high reduce speed reduction gearbox

ZX200-3 china higher decrease pace reduction gearbox 

 

PART NAME

9233692,9261222 HITACHI ZX200-three Travel REDUCTION

Products

implement to HITACHI ZX200-three EXCAVATOR

PART No.

9233692,9261222

SERIAL No.

—-

STOCK CODE

  92 514 12

FRAME HOLES

16

SPROCKET HOLES

18

Class

YWIN YWINry Parts, Excavator Spare Parts

Installation

POWER TRAIN

Software

YWIN

ITEM CONDITION

NEW

Emblem

BN

MOQ

1 pc

 

DESCRIPTION:    

1. Totally, assembly, and prepared to installed in your HITACHI ZX200-3 excavators. 

2. Without having MOTOR, already been installed the  MOTOR HOUSING & MOTOR SHAFT 

3. All elements are created by us.

4. All new, undamaged.

5. Painted or Unpainted, rely on requirement

6. 90 days guarantee, phone or email with any inquiries.

7. Plywood Circumstance Packing, cost-free of fumigation

8. Deliver to globally by Sea, Air, or Carrier.

WHY US:

  1. We are the producer and own 18000 m2 factory locations, excellent romantic relationship with materials suppliers, which make much more competitive price tag and steady top quality.
  2. We have far more than 80 models YWINd facilities for generation.
  3. We have eight senior engineers with far more than 30 several years experience on developing and machining.
  4. Our product sales expression offer you the productive support for every buyers.
  5. We are the long phrase areas provider for several popular organizations, these kinds of as FOSTER WHEELER Electricity YWIN CO.,LTD and C.R.Dinly and many others.
  6. We create spare areas for old and new excavator models, and submit our newest merchandise to clients every thirty day period so that to satisfy the marketplace demand.
  7. We have substantial market place share in Oversea industry and Domestic market, Southeast Asia 60%, Russia 10%, Middle East eight%, North and South The us 10%,Europe eight%, other folks 4%.

TRADE Conditions:
 

TRADE Terms

EXW, FOB, CFR, CIF

PAYMENT Conditions

T/T, Western Union, Alipay, Paypal

PORT

YWIN Port, negotiation

Direct TIME

  1. Stock in hand: 4-seven times for processing and packing
  2. Bulk Production: 10-35 times, rely on the amount.

Supply

By Sea, Air, Provider

Buy Flow

  1. YWINers offer the part quantity, part name, product, amount, information of products, shipping time period.
  2. We quotation the greatest price tag in accordance to the prerequisite of clients.
  3. Affirm the purchase purchase and pay the deposit.
  4. We prepare and pack the goods.
  5. YWINers make the payment according to the Proforma Invoice after the items get ready for supply.
  6. We shipping and delivery the goods with the packing list, industrial invoice, B/L and other paperwork requested.
  7. Monitor the transport and arrival about the products. 
  8. Welcome to give us suggestion and opinions once arrival.

Warranty:

one. Warranty Kind: We will substitute the product which have top quality issue.
two. Guarantee Time period:
Source 3 months warranty for the items from the day of arrival. YWINer must check the items in accordance to the get record following arrival. Get in touch with with us and provide the knowledge, pictures of the difficulty objects.
3. You need to spend for the substitution demand for adhering to situation:
* Wrong Buy from consumer.
* Natural Disasters cause the harm.
* Error set up.
* The machine and reducer work over time and above load.
* Lost by any situation.
* Human component ruined.
* Corrode with rust throughout stock and managing.
* Warranty Expired.
four. Other folks
They are the item straightforward to be rust absent, remember to wrap them effectively. We just source guarantee for the items we are producing, except the Bearing, Seal, and some others we mention prior to order.If there is any problem about the items, installation or upkeep, make sure you get in touch with with us any time. We reserve the legal rights of closing interpretation.

ZX200-3 China high reduce speed reduction gearbox