great value omega ceiling roll forming equipment
1:Our advantageous:
1): Factory direct provide price.
two): We have exported for a lot more than ten many years.
3): Our client are from about 40 international locations.
4): We have the professional analysis crew. We can make the device in accordance to your need.
five): Large-end and substantial-grade design and style
2.Specification
three.Ingredient
one. Manual De-coiler—1Set
two.Feeding Material Device—1Set
three.Roller Former Device—1Set
four.YWIN Cutting Device—1Set
five.YWIN station—1Set
6.PLC Control Box
7.Production Racks—1Sets
Technical parameters: | |||||||
one | Name of commodity & specification | Drywall Galvanized Sheet Light Steel Profiles YWIN Stud/Keep track of Roll Forming YWIN ud cd uw cw profiles | |||||
2 | Main motor power | 4kw, 3 phase | |||||
three | YWIN motor power | 3kw | |||||
four | YWIN Pressure | ten-12MPa | |||||
five | Voltage | 380V /3phase/ 50 HZ (or as your requirement) | |||||
6 | Control System | PLC Delta Inverter | |||||
7 | Main Frame | welded steel plate | |||||
8 | Backboard Thickness | 20mm | |||||
9 | Driving of device | equipment box and chain driving | |||||
10 | Feeding Material | color steel coils | |||||
eleven | Feeding Thickness | .three-one.2mm | |||||
twelve | Feeding Width | ninety | |||||
13 | Effective width | according to your ask for | |||||
fourteen | Productivity | -25m/min | |||||
fifteen | Roll Station | 10 | |||||
sixteen | Roller Diameter | 50mm | |||||
seventeen | Roller material | 45# steel | |||||
eighteen | Cutter material | Cr12 , quenched | |||||
19 | Cr-Plating Size | .05mm | |||||
20 | Overall Size | 3600×900×1200mm | |||||
21 | Total Weight | two.7T | |||||
22 | Components | Manual Uncoiler——————-1 set Guiding Platform——————1 set Coil Strip Leveler——————1 set Main YWIN of Roll Forming——1 set Electrical-Motor———————1 set Cutting Device——————–1 set YWIN Station——————1 set PLC Control———————–1 set Supporter Table——————-1 set |
|||||
23 | Workflow | Manual decoiling—-feeding and guiding—-roll forming—-cut to length—-run out table | |||||
24 | Deal | nude in the container | |||||
25 | Minimum order quantity | 1 set | |||||
26 | Payment terms | T/T(thirty% T/T pay in YWIN, the remaining 70% pay before ship) | |||||
27 | Delivery time | 30 working days later after receiving the deposit | |||||
All technical parameters can be changed, according to user’s need. |