Gear Box for Construction Building Hoist Elevator Lift

Gear Box for Construction Building Hoist Elevator Lift

ANKA YWIN carry in rack and pinion pushed builder elevate

SC200G Building Lift
Ability:2000kg
Pace: ninety m/min (VFC Control)
Cabin dimensions: 3.2 * 1.five * 2.5m (L*W*H)
Scorching dip Galvanized mast part:  650*650*1508mm
Scorching dip Galvanzied Tie-in
CE certification
Electric powered elements: Schneider brand
 

ANKA HOIST Model Capacity         (kg) Lifting speed  (m/min) YWINn system Cabin dimension       (L *W*H)  (m) Mast part dimension (mm)
Solitary CAGE SC100TD a thousand 36 Motor immediately 3.two * one.five * 2.2 650*650*1508
SC100GD 1000 – forty Frequency control 3.2 * one.five * 2.two 650*650*1508
SC200TD 2000 36 Motor directly 3.2 * one.5 * two.two 650*650*1508
SC200GD 2000 -40 Frequency management 3.2 * one.5 * two.2 650*650*1508
SC200GZ 2000 -sixty three Frequency management 3.two * 1.five * 2.two 650*650*1508
SC270GZ 2700 -63 Frequency management 3.two * one.5 * two.two 650*650*1508
DOUBLE CAGE SC100/100TD 2 X a thousand 36 Motor immediately 3.2 * 1.5 * two.2 650*650*1508
SC100/100GD two X 1000 -forty Frequency manage three.2 * one.5 * two.two 650*650*1508
SC200/200TD 2 X 2000 36 Motor right 3.two * one.five * 2.two 650*650*1508
SC200/200GD 2 X 2000 -forty Frequency management three.2 * 1.5 * two.2 650*650*1508
SC200/200GZ two X 2000 -sixty three Frequency control 3.2 * 1.five * 2.2 650*650*1508
SC270/270GZ 2 X 2700 – sixty three Frequency handle three.two * 1.five * 2.two 650*650*1508

Gear Box for Construction Building Hoist Elevator Lift