MG-ZH PAPER CUP WITH Take care of Device
Operating video clip hyperlinks:
YWINwatch?v=dvgzpxnKNv0
YWINwatch?v=WfIKK73-M_k
YWINwatch?v=Ee9nm9-ot2k
YWINwatch?v=bZfr-C9TEkU
YWINwatch?v=yFkQ1PSjQiY
Aircraft GRAPH
Products
Machine INTRODUCTION
On the foundation of multi-station paper cup maker, MG-ZH this type of cup forming tools is a variety of improvement and improve. Outfitted with a take care of applicator, this solution completes the deal with cutting and sealing immediately. It will conserve you a good deal on time and manpower.
Technological SPECIFICATION
Design | MG-ZH |
Paper cups specifications | 2-12oz (50-350ml)(mildew exchangeable) T:fifty-105mm H:50-120mm B:35-80mm |
Air supply prerequisite | Air strain: .4Mpa, Air Out-put: .6cbm/moment |
Paper specification | 140-350 GSM solitary/double PE coated paper |
Generation capacity | 50-65 pcs/min |
Voltage | 220V/380V 50Hz |
Overall Power | 6KW |
Complete Weight | 3000KG |
Dimensions | 2800mm*1200mm*1700mm |
Note | YWINized service is accessible |
Price tag
YWIN cost is 22000USD/Set FOB Montreal in automatic lubrication technique. one. Total machine is box kind buildings design and style, filling oil by spray lubrication method So that it can run quick and stably.
2. Photoelectric failure-detecting system is offered.
three. Servo management to send bottom paper of cup, provide base when cup tube arrive,
otherwise no bottom supply.
four. Stretch knife employs for bottom reducing. Effortless modified and far more secure.
Automated chain with cam program value is 16500usd/set FOB Montreal.
Automatic chain with equipment box technique cost is 15000usd/set FOB Montreal.
AFTER Companies
A. One yr guarantee. (Non-synthetic hurt of areas we will send to client, buyer
need pay for the transport cost.)
B.First time, when equipment supply, if consumer require, then we will deliver the engineer to
customer region set up the machine and adjust the equipment for buyer( customer
need pay the return tickets value, lodge expense, visa expense, engineer wage 100usd/one particular
day(include on the plane days)).
C.The details depend on contract or proforma invoice.
PAYMENT Information
Payment term:thirty% deposit shell out just before produce, the still left 70% prepare just before shipping.
Supply TIME
40-fifty doing work days soon after obtained the thirty% deposit by TT.
Certificate