20y-26-00150, 20y-26-00151 Komatsu PC200-6 Swing Gearbox

20y-26-00150, 20y-26-00151 Komatsu PC200-6 Swing Gearbox

20Y-26-00150,20Y-26-00151 Komatsu PC200-6 Swing YWIN

DESCRIPTION:

PART NAME

20Y-26-00150,20Y-26-00151 Komatsu PC200-six Swing YWIN

Equipment

apply to Komatsu PC200-six EXCAVATOR

PART No.

20Y-26-00150,20Y-26-00151

SERIAL No.

STOCK CODE

92 514 83

FRAME HOLES

  twelve

Primary SHAFT

  15TEETH,22SPLINE

Category

YWIN YWINry Parts, Excavator Spare Parts

Set up

Application

YWIN

ITEM CONDITION

NEW

Symbol

BN

MOQ

1 pc

 

DESCRIPTION:    

1. Completely, assembly, and prepared to installed in your Komatsu PC200-six excavators. 

2. Without MOTOR,

three. All parts are made by us.

four. All new, undamaged.

5. Painted or Unpainted, rely on requirement

6. ninety times warranty, phone or e mail with any questions.

seven. Plywood Situation Packing, totally free of fumigation

8. Produce to around the world by Sea, Air, or Provider.

WHY US:

  1. We are the manufacturer and own 18000 m2 factory regions, good connection with materials suppliers, which make far more aggressive price and constant top quality.
  2. We have much more than eighty units YWINd facilities for creation.
  3. We have 8 senior engineers with much more than thirty a long time knowledge on designing and machining.
  4. Our sales term provide the productive services for every single customers.
  5. We are the prolonged term components supplier for several popular businesses, this sort of as FOSTER WHEELER Power YWIN CO.,LTD and C.R.Dinly and so forth.
  6. We develop spare areas for old and new excavator models, and post our most recent goods to buyers every single thirty day period so that to satisfy the market demand from customers.
  7. We have higher marketplace share in Oversea industry and Domestic industry, Southeast Asia 60%, Russia 10%, Middle East eight%, North and South The usa ten%,Europe eight%, others four%.

TRADE Phrases:

TRADE Conditions

EXW, FOB, CFR, CIF

PAYMENT Terms

T/T, Western Union, Alipay, Paypal

PORT

YWIN Port, negotiation

Guide TIME

  1. Stock in hand: four-7 days for processing and packing
  2. Bulk Production: ten-35 days, count on the amount.

Delivery

By Sea, Air, Provider

Buy Flow

  1. YWINers provide the element number, component title, product, quantity, knowledge of things, shipping time period.
  2. We estimate the very best cost in accordance to the requirement of buyers.
  3. Verify the acquire get and pay the deposit.
  4. We put together and pack the products.
  5. YWINers make the payment in accordance to the Proforma Bill as soon as the items get ready for shipping.
  6. We shipping the items with the packing list, industrial invoice, B/L and other paperwork asked for.
  7. Track the transport and arrival about the merchandise. 
  8. Welcome to give us suggestion and suggestions as soon as arrival.

Warranty:

1. Guarantee Sort: We will exchange the item which have good quality issue.
two. Warranty Time period:
Source 3 months warranty for the items from the day of arrival. YWINer ought to verify the objects in accordance to the get list right after arrival. Contact with us and offer you the data, pictures of the dilemma objects.
three. You need to have to pay out for the substitute cost for following issue:
* Wrong Get from customer.
* Natural Disasters lead to the hurt.
* Error installation.
* The device and reducer work more than time and in excess of load.
* Lost by any situation.
* Human factor destroyed.
* Corrode with rust in the course of inventory and managing.
* Warranty Expired.
four. Other people
They are the item simple to be rust away, you should wrap them nicely. We just provide guarantee for the products we are creating, besides the Bearing, Seal, and some others we mention before order.If there is any problem about the products, installation or maintenance, you should speak to with us any time. We reserve the rights of ultimate interpretation.

20y-26-00150, 20y-26-00151 Komatsu PC200-6 Swing Gearbox