Z Sequence Single Stage Cylindrical Equipment Reducer in Hardened Tooth Surface
Gear Reducer technical knowledge
Measurement | 80,100,125,a hundred and sixty,two hundred,250,280,315,355,400,450,500,560 |
Ratio | one.twenty five, 1.four, 1.six, 1.eight, 2, 2.24, 2.five, two.8, three.15, three.fifty five, four, 4.five, five, five.six |
The rotation speed of substantial pace shaft | no far more than 1500rpm. |
The circumferential velocity of gear | no a lot more than 20m/s. |
Ambient temperature | -40~45ºC. Lubricant must be heated up to 0ºC prior to starting if the ambient temperature is below 0ºC |
Direction | clockwise and un-clockwise |
Gear Reducer Features
1.The gear is manufactured of large strength lower carbon alloy steel via carburization and quenching. The hardness of tooth area could achieve to HRC58-62. All gear adapts NC tooth grinding method, higher in accuracy and excellent in make contact with overall performance
2.High in transmission effectiveness: single stage, a lot more than 96.5% double-stage, more than 93% three-phase, far more ninety%
three.Smooth and secure in run, low sounds
4.Compact, light, prolonged daily life, large bearing capacity
five.Easy to disassemble, examine and assemble.
Equipment Reducer Aplication fields
commonly utilized in different low-pace transmissions,
which are common basic elements of mechanical transmission.
This sort of as metallurgy, mines, hoisting, transportation, cement, architecture, chemical, textile, printing and dyeing, pharmaceutical, and so forth….
FAQ
Q: What is your MOQ of this product?
A: 1pcs. For the very first time cooperation, we acknowledge trial sample get.
Q: What is actually your payment phrases?
A: thirty% T/T deposit, 70% stability ahead of shipment or L/C at sight.
Q: What is actually the delivery time?
A: 30 days soon after receiving your L/C or T/T deposit.
Q: Can we utilized our personal manufacturer on motors ?
A: Sure, we can offer OEM support, manufacture with your authorized manufacturer.
Q: How long is your guarantee?
A: 12 months after receiving B/L.
Manufacturing facility
Place of work Block
Business office Staff