Guard Rail Roll Forming Machine manufacture Prices

Guard Rail Roll Forming Machine manufacture Prices

3 Waves Guard Rail Roll Forming YWIN
1. Profile Drawing:

two. The Chart of Approach Flow

three. Primary Specification

Item NO  
Description
 
Supplied specification
1 Roll Forming YWIN Guardrail
 
2 Content Width 760mm
3 Rolling Pace 5-12m/min
4 Rolling Thickness 2.-three.2 mm
five Manage Technique PLC  (Panasonic) as list in the notice
six Un Coiler ten ton hydraulic de-coiler with coil auto
seven Pre-chopping By hydraulic
eight Leveling Station one station (a few rollers in excess of 4), seven.5kw
9 Punching Four sets
10 Chopping mode YWIN reducing
eleven Substance Of Reducing Cr12Mov quenching fifty eight-62ºC
twelve YWIN Station Electrical power 22kw
13 YWIN Stress 20-25Mpa
fourteen Conveyor table 3KW, six meters
fifteen Roller Stations 20 stations (in accordance the closing style)
16 Roller Material GCR15, HRC58-62ºC
coated with chrome
17 Shaft Substance and DIA ¢100mm, content is 45# forge steel
18 Maim Motor Power 55kw
19 Composition Of The Stations Forged iron
twenty Tolerance 3m+-1.5mm
21 Electric Supply 380V, 50HZ,3 stage
According to customer’s demand
 
22 Way Of YWIN By gearbox
23 Shade Of The YWIN Yellow and blue
24 Container Need to have 1 x40 ft & one x20 toes

4. Packing & Shipping and delivery
Provide time: take products soon after obtain deposit sixty times
Packing: suited of ocean transportation

five. Guarantee
Warranty: 1 year guarantee from day of shipment
Assure:
1: Guaranteed against malfunctions thanks to manufacturing flaws for 1 12 months soon after day of shipment. Repairs will be created totally free of cost.
two: Repairs will not be carried out free of modify even during the assure time period in the stick to conditions
–  Damage occurs due to a natural disaster
–  Malfunction occurs owing to user mistake
–  Malfunction occurs thanks to modifications
–  Malfunction occurs thanks to additional motion or cargo following installation
three:Air ticket, transportation cost, resort, foods and a hundred$ for each day shall be for purchaser’s account if manufacturer’s engineer has to be send out to purchaser’s manufacturing facility to maintain the machine during the promise period of time.
 
six. Payment Expression
   30% deposit by T/T in YWIN and 70% stability following inspection affirmation prior to cargo

Interest: The profile of the panel is in accordance to the customers!

Guard Rail Roll Forming Machine manufacture Prices