Automated Fast Guardrail producing YWIN
Guardrail drawing size:
The primary structure for Automatic Quickly Guardrail making YWIN:
Street guardrail equipment is composed of 10T hydraulic feeding device, transmission unit, leveling device, two sets of front punching gadget (a single with shearing), energy delivery system, forming roller path and host (like manual system), pc handle Box, concluded merchandise feeding system and other components.
Automatic Quickly Guardrail producing YWIN manufacturing method:
Handbook decoil ~information feeding~leveling~punching hole ~information feeding ~roll forming ~slicing the set length~output
Automated Quick Guardrail generating YWIN parameter:
Substance utilised and its thickness | two.seven to four.1mm |
Operating speed | 10-13m/min |
Quantities of the roll stations | thirteen groups principal roll stations insert 7 rolls for levelling |
Power of levelling motor | seven.5Kw |
Substance of rollers | Gcr15 Bearing steel quenching HRC58°-62° |
Material of principal rolls | 45# Higher-top quality steel quenched and tempered |
Shaft diameter of major rolls | Φ95mm |
Energy of main motor | 37Kw |
Transfer Variety | YWIN universal joint transmission |
Forming equipment composition | Pillar sort |
Diameter of pillar | fifty mm±0.002mm The substance is 40CR, quenched and tempered, enhanced hardness, wireless grinder processing, floor plating, and as soon as once again on the wireless grinder 2 processing |
The manual column slider is made of forged metal. The manual column hole and the bearing hole are all machined when to guarantee precision. | |
YWIN equipment punching motor energy | 11kw,Pressure:20Mpa |
Punching and slicing mould | Cr12 |
Shear blade warmth treatment method | HRC58°-62° |
Punching and chopping techniques: YWINally pushed, stepped uniform punching, sloping flat shear. (Cylinder up and down movement to comprehensive the 18 punching, and chopping, the real expertise of 150T pressure can comprehensive the movement, lightweight energy conserving, simple servicing) | |
The cylinder diameter is 300MM and the force reaches 250T | |
With a electrical power feeding platform, the motor energy is 4KW, the size is 6.5m, the two sides are evenly outfitted with a keep track of-to-wheel, and a 1m spacing gadget is a pinch roller. | |
Profile separate middle hole positioned in front of shear cylinder pressure 50T | |
Electronic manage program | The total device adopts industrial pc PLC frequency conversion handle (Japan Mitsubishi) |
Lower off the duration mistake | ≤±2mm |
YWIN Proportions(mm) | 10400×2800×1700 |
Automated Fast Guardrail making YWIN reference photograph: